Before you buy land in Texas, confirm who provides water and sewer, what it costs to connect, and whether the lot can support a septic system. Here's how.
Start by finding out which utility holds the right to serve the land. The Public Utility Commission of Texas (PUC) maintains a CCN Viewer that shows retail water and sewer service area boundaries. Then call that provider and ask two questions: is there a line close enough to serve this lot, and what will it cost and how long will it take to connect? If public sewer isn't available, the lot will need a septic system, and that depends on a site evaluation and a permit from the local authority before anything is built.
A water line on the map is not the same thing as water at the lot. That gap is where land buyers get surprised.
In Texas, retail water and sewer providers can hold a Certificate of Convenience and Necessity, or CCN. A CCN authorizes a utility to provide water or sewer service in a defined area. The PUC's CCN Viewer lets you view and download those boundaries and see whether a retail utility holds a CCN for a particular site. If the map is hard to read, the PUC's Water Utilities Division mapping staff can help identify the CCN holders for an area.
Here's what I want buyers to understand. Inside a city, the answer is often simple: the city serves it. On the edges of the west side of the metro, in unincorporated Tarrant County and out toward Parker County, the provider may be a different utility entirely, and water and sewer can come from two different places. Knowing the name of the provider is step one. It doesn't tell you anything yet about cost or timing.
Texas Water Code Section 13.257 requires a seller of property in a certificated water or sewer service area to give the buyer a written notice before a binding contract is signed. The notice tells the buyer there may be special costs or charges required before service is received, that construction time may be needed, and that the buyer should contact the utility about both.
If that notice isn't given, the statute gives the buyer remedies, including the right to terminate the contract. The statute also lists transfers it doesn't apply to, including certain property inside a city served by that city's own utility.
I read that notice as a to-do list, not a formality. It's the law telling you to call the utility. When it shows up in a contract, I want the call made before the option period ends.
When you reach the provider, these are the questions that change the numbers:
Get the answers in writing when you can. On a piece of land a client is serious about, I'd rather spend a week waiting on a utility letter than spend months discovering that the cheapest part of the deal was the dirt.
When public sewer isn't an option, the home will need an on-site sewage facility, which most people call a septic system. According to the Texas Commission on Environmental Quality (TCEQ):
Local rules matter here. Tarrant County's on-site sewage program, for example, says a permit is required for all new construction and that single-family lots in subdivisions on septic must be at least one acre, net of drainage and floodplain easements. That's the kind of rule that can decide whether a lot works for the house you have in mind, so find out who the permitting authority is for that specific address.
On land without a water provider, the answer is usually a private well. Before you count on one, check whether the land is inside a groundwater conservation district and what that district requires. In Tarrant County, that's the Northern Trinity Groundwater Conservation District, created to manage and protect the county's groundwater. The district is the right first call about its rules for new wells. A water well contractor can speak to depth and cost for the area.
When a client sends me a lot they love, my first question isn't about the view. It's this: where does the water come from, and where does it go?
From a design perspective, utilities quietly shape the whole plan. A septic system needs its own area, with setbacks, and that space isn't available for a pool, a guest house or the backyard you were picturing. An aerobic system has ongoing maintenance. A long line extension can change your budget before you've chosen a single finish. None of that makes a lot a bad lot. It just needs to be priced in before you decide, not discovered at permitting.
So the steps are usually the same. Identify the provider on the PUC map. Call the provider and get the cost and timing in writing. If it's a septic area, talk to the permitting authority and get a site evaluation scheduled inside the option period. If it's a well, call the groundwater district. And pair all of it with the flood map, because the higher, drier part of a lot is often where both the house and the septic field want to go.
If you're comparing land to build on, my build-on-your-lot roadmap walks through the rest of the due diligence, and how to check if land is in a flood zone covers the other question I ask on every lot. You'll find more for land and income property buyers on our Investors page.
Before you buy dirt, let's make sure you're buying opportunity. Send me the address and what you want to build, and I'll help you figure out whether the land supports the vision.
— Katie Bankston, Principal, The Bankston Group at The Agency Dallas
The Public Utility Commission of Texas has a CCN Viewer that shows retail water and sewer service area boundaries and whether a utility holds a certificate to serve a particular site. The PUC's Water Utilities Division mapping staff can also help identify the providers for an area.
Under Texas Water Code Section 13.257, a seller of property in a certificated water or sewer service area must give the buyer a written notice before a binding contract is signed, with some exceptions, including certain property inside a city served by the city's own utility. The notice warns that there may be special costs and construction time before service is available.
In almost all cases, yes. TCEQ says a permit and approved plan are required to construct, alter, repair, extend or operate an on-site sewage facility. The permit usually comes from a local permitting authority, and the process starts with a site evaluation by a licensed site evaluator or professional engineer.
Not necessarily. Soil conditions, lot size, setbacks and local rules all play a part, and TCEQ notes that many Texas soils require an alternative system rather than a conventional one. A site evaluation and a conversation with the local permitting authority will tell you what's possible on a specific lot.
Tarrant County is in the Northern Trinity Groundwater Conservation District. Contact the district about its requirements for new wells before you rely on one for a home site.
This article is general information, not financial or legal advice. Utility service, fees and septic and well rules vary by provider and permitting authority and change over time; confirm current requirements with the utility, the local permitting authority, the groundwater conservation district, a licensed site evaluator or engineer, and a real estate attorney. The Bankston Group is a team at The Agency Dallas.